Saturday, January 24, 2009

The Inside Scoop

A few shots on the inside. The first two are the basement level. The second shot is the frame for the closet where the air handling unit will go - heating and cooling for both levels of the addition. The other three shots are inside the sunroom.

It has been eye opening to watch the whole process. There has been a constant stream of specialists coming and going - one crew to work on the roof and soffits, one to do the gutters, one to do the masonry, one to do the electrical, one to do the insulation, one to do the HVAC, plus the general contractor to do framing and keep track of everything including the inspections.

Next step should be the exterior siding and the drywall inside. Things are moving quite quickly so more posts will come soon.